Farmhouse, Scotland – ETA Hack 90kW

Wednesday, 24 October 2018

ETA Hack 90kW Biomass Boiler Installation Partner: Dunster Biomass Heating Project: The customer wished to use his own timber to provide heat for a farmhouse, cottage, farm workshop and various ancillary buildings as well as to pre-heat air for his grain drying system. Solution: An ETA Hack 90kW boiler was installed with a fully networked controls to provide weather compensated heating for...

Read full story

Innes, Scotland – ETA Hack 200kW

Wednesday, 24 October 2018

ETA Hack 200kW Biomass Boiler Installation Partner: Dunster Biomass Heating Project: The client requested a system to minimise reliance on fossil fuels and maximise estate self-sufficiency. The principal requirement was to heat a large private house used for corporate entertainment and weddings which was costing in excess of £24,000 per year to heat with oil. The installation had to be sympathetic...

Read full story

Sutton Hoo, Suffolk – ETA Hack 200kW

Wednesday, 24 October 2018

ETA Hack 200kW Biomass Boiler Installation Partner: East Green Energy Project: The National Trust wanted to replace the existing LPG boiler at Sutton Hoo site that was heating the listed museum and three holiday cottages with the aim to reduce carbon emissions whilst increasing efficiency and reliability. Solution: An ETA Hack 200kW boiler was installed in a perfectly suited space within a...

Read full story

Glenisla, Parklands Care Group – x2 ETA PE-K 110kW

Wednesday, 24 October 2018

2 x ETA PE-K 110kW Biomass Boiler Project: Glenisla is a 42-bed operational care home which is part of the Parklands Care Group. This is a fully funded project to replace an existing electric heating system. Due to space restrictions a containerised solution was used where boiler and fuel store are all set up and ready to go in...

Read full story

Warehouse, Lancashire – ETA Hack 130kW & Hack 200kW

Wednesday, 24 October 2018

ETA Hack 130kW & ETA Hack 200kW Biomass Boilers Installation Partner: H2O Renewable Energy Solutions Project: A manufacturing factory along with offices and a warehouse had a complete refurbishment. The company wanted a modern, reliable and efficient heating system that comes with the added benefit of being eligible for the Renewable Heat Incentive (RHI). Solution: A centralised heating system was...

Read full story

Custom Precision Joinery – ETA Hack 350kW

Wednesday, 24 October 2018

ETA Hack 350kW Biomass Boilers Installation Partner: AFS Biomass Project: The client was spending in excess of £10,000 on fuel for their current setup with a look at expansion in the form of a finishing shop and drying room. The nature of the business meant they had an abundant supply of waste wood which was ideal for a biomass boiler....

Read full story